2026-09-19 21:03 UTC
Replies (2)
-
@jfmezei@cosocial.ca 2026-09-19 21:07
@EdwinG@mstdn.moimeme.ca The crutches are still there, and there was no point in rebuilding it at the time due to the long term project of eliminating the circle and having just an underpass under highway. (Dorval Avenue extended). As long as the crutches are holding and they don,t need to duct tape it every weekend, the priority remains to rebuild the St-Pierre interchange (A20 to Mercier Bridge). Ad that was delayed by the sudden priorioty to rebuild the Île Aux Touurtes bridge at Senneville/Vaudreuil.
-
@jfmezei@cosocial.ca 2026-09-19 21:08
@EdwinG@mstdn.moimeme.ca Once they completed both directions of overpasses between 20 and airport, it greatly reduced the amount of traffic at the circle (except now because Airport wrecked its own roads/parking).