We found that the PLC code actually contained logic that would lock up the train with bogus error codes after some date, or if the train wasn't running for a given time. One version of the controller actually contained GPS coordinates to contain the behaviour to third party workshops. It was also possible to unlock the trains by pressing a key combination in the cabin controls. None of this was documented. 2/4

Replies (1)

  • @q3k@social.hackerspace.pl 2023-12-05 14:00

    The key unlock was deleted in newer PLC software versions, but the lock logic remained. After a certain update by NEWAG, the cabin controls would also display scary messages about copyright violations if the HMI detected a subset of conditions that should've engaged the lock but the train was still operational. The trains also had a GSM telemetry unit that was broadcasting lock conditions, and in some cases appeared to be able to lock the train remotely. 3/4

    Open ##4977783